-
Major Roads Leve
Source Lden Lnight Lday Levening LAeq,16hr Major RoadsThose which have more than three million vehicle passages a year (for mapping rounds other... -
Coastal Superficial Geology
The Geological Survey Northern Ireland (GSNI) was commissioned to complete the coastal superficial geology project in November 2022.The superficial geology dataset produced... -
Lakes of Northern Ireland
Map of all of Northern Ireland's lakes for which data was available to NIEA during 2013. -
Linear Regression Rate
The primary objective from this project was to acquire historical shoreline information for all of the Northern Ireland coastline. Having this detailed understanding of the... -
1991 AP
The primary objective from this project was to acquire historical shoreline information for all of the Northern Ireland coastline. Having this detailed understanding of the... -
1990 AP
The primary objective from this project was to acquire historical shoreline information for all of the Northern Ireland coastline. Having this detailed understanding of the... -
Fault or fracture trace
The Geological Survey of Northern Ireland (GSNI) was commissioned to produce a Northern Ireland wide coastal geological dataset, detailing the bedrock geology.GSNI used the... -
1973 OS 27 10K
The primary objective from this project was to acquire historical shoreline information for all of the Northern Ireland coastline. Having this detailed understanding of the... -
Toome AquaTROLL Metrics View
The multiparameter sonde has been deployed on a buoy by NIEA’s Freshwater Monitoring and Assessment Team as part of long term, high frequency water quality monitoring... -
1951 AP
The primary objective from this project was to acquire historical shoreline information for all of the Northern Ireland coastline. Having this detailed understanding of the... -
1979 OS 27 10K
The primary objective from this project was to acquire historical shoreline information for all of the Northern Ireland coastline. Having this detailed understanding of the... -
Major Railway LAeq 18h
Source LdenLnight Lday Levening LAeq,16hr LAeq,6hr LAeq,18hr Major Railway Those which have more than 30,000 train passages per year (for... -
1974 AP
The primary objective from this project was to acquire historical shoreline information for all of the Northern Ireland coastline. Having this detailed understanding of the... -
River Water Quality Monitoring 1990 to 2018 - pH
This table provides the raw data from river monitoring sites including Water Framework Directive monitoring sites. It should be noted that, as the data set is in its raw state,... -
River Water Quality Monitoring 1990 to 2018 - Alkalinity
This table provides the raw data from river monitoring sites including Water Framework Directive monitoring sites. It should be noted that, as the data set is in its raw state,... -
2021 NI 3D Coastal Survey - Satellite Derived Bathymetry - Digital Terrain Model
In 2021 a high resolution (minimum 10 meters) satellite-derived bathymetry survey was complete for the full extent of the Northern Ireland marine area to a maximum depth of 8-11... -
Department of Finance - Departmental Expenditure Over £25,000 24/25
A monthly updated list of all financial transactions over £25,000 made by the Department of Finance, as part of the NICS's commitment to transparency in expenditure. -
Lough Neagh Network Contribution
About this layerNetwork contribution area scores were exported from the SciMAP application outputs within SAGA GIS. The scores were based on inputs from CEH Land cover 2007, Met... -
Probe Metrics
The multiparameter sonde has been deployed on a buoy by NIEA’s Freshwater Monitoring and Assessment Team as part of long term, high frequency water quality monitoring... -
2021 NI 3D Coastal Survey - Pilot Bathymetric LiDAR - Orthophotography Natural Colour
A pilot bathymetric LiDAR survey was commissioned in 2021 as part of the NI 3D Coastal Survey. This mapped the nearshore areas of Dundrum Bay and areas of Carlingford Lough....