-
Planning Applications 2025
Planning application boundaries 2021 to 2030 -
Area of Designated Green Belt Land
Area of Designated Green Belt Land (hectares). Only london boroughs with some greenbelt land shown. A GIS of this land for all of England has now been made available by DCLG.... -
Mayoral Development Corporation Boundary
GIS files showing the boundary of the new Mayoral Development Corporation following the consultation period from February to April 2011. -
Biodiversity Hotspots for Planning
Dataset last updated: 8th January 2025 This dataset provides indicative areas of biodiversity hotspots in Greater London, identified by research and data analysis using methods... -
Strategic Industrial Location Points (London Plan Consultation 2009)
Strategic Industrial Locations (SILs) as identified in the London Plan Consultation 2009. These comprise Preferred Industrial Locations (PILs) and Industrial Business Parks and... -
Central Activities Zone Boundary (London Plan Consolidated with Alterations...
The Central Activities Zone (CAZ) as shown in The London Plan Consolidated with Alterations since 2004, not finalized and therefore provided for illustrative use only. The... -
Sub-regions (London Plan Consolidated with Alterations since 2004)
GLA sub-region boundaries as defined in The London Plan Consolidated with Alterations since 2004. Created by merging borough boundaries into five sub regions. Note that these... -
Strategic Industrial Location Points (London Plan Consolidated with...
Strategic Industrial Locations (SILs) as identified in The London Plan Consolidated with Alterations since 2004. These comprise Preferred Industrial Locations and Industrial... -
Opportunity Area Points (London Plan Consolidated with Alterations since 2004)
Areas identified in The London Plan Consolidated with Alterations since 2004 as being London’s principal opportunities for accommodating large scale development to provide... -
Inner and Outer London Boundaries (London Plan Consolidated with Alterations...
Inner and Outer London as defined in The London Plan Consolidated with Alterations since 2004, represented as two polygons and based on Borough boundaries. One of several... -
Areas for Intensification Points (London Plan Consolidated with Alterations...
Areas identified in The London Plan Consolidated with Alterations since 2004 as having significant potential for increases in residential, employment and other uses through... -
Sub-regions (London Plan Consultation 2009)
GLA sub-region boundaries as defined in the London Plan Consultation 2009. Created by merging borough boundaries into the following five sub regions: Central, North, East, South... -
Inner and Outer London Boundaries (London Plan Consultation 2009)
Inner and Outer London as defined in the London Plan Consultation 2009, represented as two polygons and based on Borough boundaries. One of several different versions of inner... -
Central Activities Zone Boundary (London Plan Consultation 2009)
The Central Activities Zone (CAZ) as shown in the London Plan Consultation 2009, not finalized and therefore provided for illustrative use only. The CAZ is the area where... -
Areas for Intensification Points (London Plan Consultation 2009)
Areas identified in the London Plan Consultation 2009 as having significant potential for increases in residential, employment and other uses through development of sites at... -
Age of Commercial and Industrial Stock, Borough
Commercial and Industrial stock by date built. Average rateable value - £/m2 Total Rateable value - £'000s Total Floorspace - 000s m2 Hereditaments - Number -
Redbridge Planning Development Control
Planning application and development control. Quarterly return on volume, fees and performance against national indicators. The data supplied has been extracted from the... -
Land Use - Previously Developed Land, Borough
An estimate of the amount of previously-developed (or brownfield) land in England which may be available for re-development, and also an estimate of the potential number of... -
London Plan AMR14 Tables and Data
The London Plan Annual Monitoring Report (AMR) 14 covers the period from 1st April 2016 to 31st March 2017. It provides information about progress being made in implementing the... -
MCIL 2 charging area boundaries
This page contains the spatial boundaries from the Mayor's Community Infrastructure Levy 2019 (known as MCIL 2), which replaces MCIL 1 on 1st April 2019. The following can be...